Build a winning Project Team
Fundamental to to delivering a championship performance is assembling a TEAM that wants to win. This is a challenging process that...
Hitting the Target with Lean Design
Why Lean Design? The book “Broken Buildings Busted Budgets” does a good job of describing the two main problems with the building...
Recognizing Lean Project Pioneering Efforts in Canada
In 2008 the Churchill Northern Studies Centre was excited to announce the design and planning of a $15 million facility upgrade is...
How to Fix a Broken Budget?
At the tender opening there were no smiles as the lowest bid was $2.2M over on a $7.5 budget. To determine if we could fix the BROKEN...
LeanCx | Commissioning for Performance, Profit and Productivity
LeanCx introduced at LCI National Conference Our Okanagan College project team introduced the concept of LeanCx as a proactive...